Titanium tube welded using inert gas welding area for the effective protection of TiG welding process. Since
titanium has special physical and sunrui titanium alloy pump chemical properties , and thus there is a big difference in the welding process
and other metals.
Titanium pipe welding must ensure :
Pollution ( a ) weld metal zone is not more than 250 ℃ reactive gas N, 0, H and harmful impurity elements C, Fe, Mn
and the like.
( 2 ) can not form a coarse grain structure .
( 3 ) does not produce a large welding residual stress and deformation. Therefore, the welding process is required
to reserve the construction sequence , in strict accordance with process quality management standards , the
implementation of quality control of the whole process. People , machine , material, method factors are controlled
in a good state to work in a reasonable period, to ensure the quality of welding titanium tube.
Titanium pipe welding using materials, equipment and tools
4.1 titanium pipes and fittings : shall have the manufacturer's factory certification and quality certificates .
After retesting its size, chemical Sunrui aerospace investment casting composition , mechanical properties and availability status should comply with
DIN17850 standards.
Titanium pipe welding material
Wire ; wire grades ERTi-2, select the wire should meet the following requirements:
(L) the chemical composition and mechanical properties of the wire should be fairly and base metal ;
( 2 ) If the welded parts require high plasticity , should adopt a purity higher than the base metal wire.
Wire retest before using the material , the factory inspection certificate and certificate of quality to be ; wire
surface should be clean and free of Sunrui titanium coils oxidation color , no cracks , peeling, spot scars and defects such as slag . The
chemical composition of the wire should comply with the relevant provisions of AWSA5.16-70 's .
4.2.2 Argon : Industrial a pure argon , purity not less than 99.98% , moisture content of less than 50Mg/m3.
Argon using the factory to check the bottle on the certificate to verify the purity argon indicators , and then
check for leaks or malfunctioning cylinder valve first elephant.